The purpose of this paper is to address a shortfall in the literature dealing with optimal sharing arrangements. In construction projects, where the owner is concerned about multiple project outcomes (cost, time, quality, […]), there exist no guidelines in the literature on what a sharing arrangement should be between the owner and the contractor. This paper gives that arrangement, under defined risk assumptions on the contractor (risk averse ranging to risk neutral) and the owner (risk neutral). The sharing aligns the contractor’s interests with those of the owner.