|
|
|
|
|
|
|
|
|
|
Capacitated lot-sizing and production sequence problem with setups complexity
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi, Behrooz Karimi, Marzieh Fadaei Moludi
(2025)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Multi-objective multi-factory scheduling
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi
(2021)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Optimal design of cross docking supply chain networks with time-varying uncertain demands
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi, Fariborz Jolai, Mehdi Telgerdi
(2018)
|
|
|
|
|
|
|
|
|
|
|
Agent-based approach for cooperative scheduling
Javad Behnamian
(2016)
Journal of Industrial and Systems Engineering: 9(4); 26-46
|
Survey on fuzzy shop scheduling
Javad Behnamian
(2016)
Fuzzy Optimization and Decision Making: 15(3); 331-366
|
A survey of multi-factory scheduling
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi
(2016)
JOURNAL OF INTELLIGENT MANUFACTURING: 27 (2); 231-249
|
Graph coloring-based algorithm to parallel jobs scheduling on parallel factories
Javad Behnamian
(2016)
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING: 29(6); 622-635
|
Multi-cut Benders decomposition approach to collaborative scheduling
Javad Behnamian
(2015)
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING: 28; 1167-1177
|
|
|
|
|
Realistic variant of just-in-time flowshop scheduling: Integration of Lp-metric method in PSO-like algorithm
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi, M. Zandiye
(2014)
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY: 75; 1787-1797
|
Particle swarm optimization-based algorithm for fuzzy parallel machine scheduling
Javad Behnamian
(2014)
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY: 75; 883-895
|
|
|
|
|
|
|
Multi-objective fuzzy multiprocessor flowshop scheduling
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi
(2014)
APPLIED SOFT COMPUTING: 21; 139-148
|
An iterative method for forecasting most probable point of stochastic demand
Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi, Behrooz Karimi, M. Fadaei Moludi
(2014)
Journal of Industrial Engineering International: 24; 10-64
|